The Oka River cable car is a public transit facility under construction that will connect the Zarechye (trans-river) and upper parts of Nizhny Novgorod. Construction began in August 2025, and service is scheduled to open in 2027. The project is being carried out under a concession agreement with the government of Nizhny Novgorod Region; the concessionaire is JSC Urbantech Cable Cars.[1]
Route and stations
The 3,340-meter line will run from Zarechny Boulevard to Shveytsariya Park. Three stations are planned along the line: Zarechnaya (at Zarechny Boulevard, next to the former Rossiya movie theater)[2], Tikhaya Gavan, and Prospekt Gagarina (next to the Okeanis shopping and entertainment center of the same name). The architectural concept for all three stations was developed by Nizhny Novgorod architect Stanislav Gorshunov; the stations will have architectural lighting to create an attractive appearance in the evening.[3] Sixty cabins will run along the route; the estimated travel time is 15 minutes, which is faster than driving across the Molitovsky Bridge. Each of the 60 cabins is designed for eight passengers and is equipped with heating; the line is scheduled to operate from 6:45 a.m. to 10:00 p.m.[4][5]
Design
The route will have 15 supports made of high-strength steel. Roller balancers will be fixed to the tops of the supports, and the haulage-and-carrying rope will be run over them; the total mass of the steel cable exceeds 80 tons. The haulage-and-carrying rope is 54 millimeters in diameter and had already been delivered to the site by the time the first supports were installed.[2][5] The first support was installed on August 5, 2026, on Zarechny Boulevard, next to the future Zarechnaya station. The second support was installed on Bauman Street, next to the future Tikhaya Gavan station; the station itself is being built in the area of Bauman, Matrosskaya, and Pravdinskaya streets.[6] It is a tubular structure 18 meters high: the diameter is 1.8 meters at the base and 1 meter at the top; the shape was chosen to suit the surrounding urban development.[1][7]
Before installing the first support, the builders relocated utility lines, prepared pile foundations, and carried out the preliminary assembly of the metal elements; the lift was performed using heavy equipment. By the beginning of August 2026, pile work had been completed at roughly 90% on all sites along the route; assembly of the next supports is continuing at the same time. As of mid-2026, eight of the 15 planned supports had been installed along Zarechny Boulevard from Zarechnaya station; in parallel, at a shopping center near Prospekt Gagarina station, preparations were under way for the foundations of the next two supports — reinforcing the bases and installing anchor fastenings.[8] At the same time, a foundation is being built at the Prospekt Gagarina station site with the use of a tower crane.[1]
Transportation context
According to Sergey Morozov, Deputy Governor of Nizhny Novgorod Region, about 100,000 Nizhny Novgorod residents currently live in the immediate vicinity of the route. By 2033, more than 700,000 square meters of housing are planned to be commissioned within the line's catchment area on both banks of the Oka. The new line is seen as transportation provision put in place in advance, both for current residents and for future residents of the neighborhoods now taking shape.[7]
Nizhny Novgorod's first cable car — the cable car to Bor across the Volga — has been in operation since 2012; the cable car across the Oka will be the city's second.
Financing and timeline
The cost of the project is estimated at 5.2 billion rubles. Of this amount, 2.9 billion rubles is a capital grant from Nizhny Novgorod Region, provided from funds of an investment budget loan.[2] The bulk of the construction work is planned to be completed by the end of 2026, with the launch of passenger service in 2027.[1]
The line's design capacity is more than 30,000 passengers per day.[6]
Compared with existing routes, a cable car trip shortens travel time by about half an hour.[6]
The GORA bureau, under his leadership, based the project on the idea of open architecture, in which the engineering structures themselves shape the visual image of the buildings rather than hiding behind decorative elements. The project was awarded a special prize of the national architectural award "Project Russia" in the category "For a Futuristic and High-Tech Image of a New Urban Transport Link." In addition, the project received three awards from the national independent architectural rating "Golden Capital": a superfinal participant's diploma, a special diploma from the organizing committee, and a "Hamburg Score" diploma, second degree; about a thousand architects from various cities across Russia took part in the "Hamburg Score" vote. A model of the stations was presented at the National Center "Russia" at the exhibition "The Birth of Scale. Architecture of the Future," devoted to promising directions in the development of Russian architecture.[9]
Chronicle of events
Details of each event are in the article about it; here are the dates and gist.
- — Eight of fifteen support pillars for the cable car crossing the Oka River in Nizhny Novgorod have been installed.[8]
Sources
- NIA "Nizhny Novgorod" — The first support tower of the cable car across the Oka has been installed in Nizhny Novgorod (archive)
- Open Nizhny — The load-bearing haul rope is 54 millimeters in diameter and had already been delivered to the site by the time the first towers were installed. (archive)
- NIA "Nizhny Novgorod" — Construction of the cable car across the Oka has begun in Nizhny Novgorod — The architectural concept for all three cable car stations was developed by Nizhny Novgorod architect Stanislav Gorshunov… (archive)
- Kommersant (Volga Region) — From This Bank to That — Each of the 60 cabins is designed for eight passengers and is heated. The cable car is scheduled to operate from 6:45 a.m. to 10:00 p.m. (archive)
- GIPERNN — The first support tower for the cable car across the Oka has been erected on Zarechny Boulevard (archive)
- Newsroom24 — The second cable car tower has been installed on Bauman Street — next to the future Tikhaya Gavan station. The station is being built in the area of Bauman, Matrosskaya, and Pra (archive)
- Vremya N — The first support tower of the cable car under construction across the Oka has been installed on Zarechny Boulevard (archive)
- Newsroom24 — As of mid-2026, eight of the 15 planned supports have been installed along Zarechny Boulevard from the Zarechnaya station; in parallel, near the shopping center
- Nizhegorodskie Novosti — The architectural concept of the stations was developed by the Nizhny Novgorod bureau GORA under the leadership of Stanislav Gorshunov. The project is based on the idea of open architecture, in whi
- Zhivyom v Nizhnem — The architectural concept of the cable car stations was developed by the Nizhny Novgorod bureau GORA. The project was presented at the national independent architectural rating
- Newsroom24 — The architectural concept of the stations of the cable car across the Oka received three awards from the national independent architectural rating "Golden Capital": a participant's dipl
- Vremya N — The architectural concept of the cable car across the Oka was developed by the Nizhny Novgorod bureau GORA under the leadership of Stanislav Gorshunov. The project is based on the idea of open
- GTRK "Nizhny Novgorod" (Vesti) — The first support tower of the new cable car across the Oka has been installed on Zarechny Boulevard (archive)