Urbantech Group of Companies is a Russian company acting as concessionaire in cable car construction projects in Nizhny Novgorod. It is best known as a party to the concession agreement, signed in February 2023, with the government of Nizhny Novgorod Region for building a new cable car across the Oka.[1]
Concession for the Cable Car across the Oka
On February 16, 2023, the government of Nizhny Novgorod Region and Urbantech Group signed a concession agreement for the construction of a cable car from Zarechnaya metro station to the Okeanis shopping center near Shveytsariya Park. An intermediate station, Tikhaya Gavan station, is planned in the area of Bauman Street. The route is 3.3 kilometers long in total, with an estimated travel time of 15 minutes. The value of the concession contract was 4.3 billion rubles; the facility was originally scheduled to open in 2025. Projected ridership is 10,000 people per day at a starting fare of 200 rubles per ride, rising in stages to 220 rubles in 2026 and 240 rubles in 2027.[1]
Preparation for construction began in April 2024. To lay out the route, seven land plots in the Leninsky and Sovetsky Districts of the city were to be cleared.[2] As part of the concession, the company took on obligations to expand the recreation area on Zarechny Boulevard: an additional plot of 6,140 sq. m adjoining the boulevard from the east was included within the boundaries of the landscaped public-use area in this district, and the total area of the landscaped public-use area exceeded 58,500 square meters.[3]
Following public hearings held as part of the state environmental review from July 21 to August 19, 2024, Urbantech, together with the government of Nizhny Novgorod Region, adopted a design decision that rules out installing cable car towers within the boundaries of the regional-level natural monument "Sluda urochishche (a named natural locality)". The load-bearing haul rope will pass over the protected area above the treetops, taking their future growth into account. The company undertook to compensate the municipality, in kind and in money, for the trees and shrubs to be cut down.[2]
Project for a Cable Car on the Right Bank of the Oka
In addition to the crossing of the Oka, Urbantech Group has developed an architectural and planning concept for another cable car — between Chernigovskaya Embankment and the Neymark IT Campus, both of whose endpoints are located on the right bank of the river. 7.1 million rubles have been allocated for this design work. The line will be 240 meters long, with a planned capacity of up to 650 passengers per hour; two stations are planned along the route: one on Chernigovskaya Embankment and one at the campus's research building in the area of Barminskaya Street. The construction is included in the regional public transport development program for 2026–2030, with a total budget of about 2.4 billion rubles and an implementation schedule of 2027–2029.[4]
Operation of the Nizhny Novgorod — Bor Cable Car
The existing Nizhny Novgorod cable car, which connects Nizhny Novgorod with the town of Bor, is operated by an affiliated company — Urbantech Service LLC (OOO "Urbantech Service").
Sources
- Govorit Nizhny — Agreement on construction of a cable car across the Oka signed
- NIA "Nizhny Novgorod" — "Urbantech" promised not to affect "Sluda Urochishche" during construction of the cable car, Nizhny Novgorod News
- GIPERNN — Promenade area on Zarechny Boulevard to be expanded with the arrival of the cable car
- nn.aif.ru — A new cable car in Nizhny Novgorod is planned for 2.4 billion rubles — AiF Nizhny Novgorod
