Vodnik Stadium is a sports facility in the center of Nizhny Novgorod, located in the block bounded by Volodarskogo, Gruzinskaya, Alekseevskaya, and Osharskaya streets. During Great Patriotic War, it served as one of the assembly points for those liable for military service; in the Soviet period and later, it was used as a city stadium with a football field and adjoining sports grounds. In the summer of 2025, City Hall declared the facility unsafe and closed access to its grounds for safety reasons.[1]
Zvezdinka Street, which leads from the House of Communications, historically ends at Vodnik Stadium, connecting it with Malaya Pokrovskaya.[1]
Role during the Great Patriotic War
From the first days of the war in June 1941, Vodnik Stadium was one of ten assembly points for those liable for military service in the city of Gorky. Between 800 and 1,000 people being mobilized passed through these points every day.[2]
Unsafe condition and legal proceedings
After the stadium was declared unsafe in 2025, a citizens' initiative group from Nizhny Novgorod challenged the decision in court. As of mid-2026, a third expert examination of the site has been carried out, and the legal proceedings are ongoing. Activists who opposed the redevelopment of the stadium lost their court case against City Hall and the regional government: the court rejected their demand to declare the actions to demolish the stadium unlawful. The initiative group of Vodnik's defenders sent an appeal to the Administration of the President of the Russian Federation, expressing their disagreement with the integrated territorial development (KRT) project.[3][4][5]
Plans for Integrated Territorial Development
In the fall of 2025, a master plan for integrated territorial development (KRT) was presented, developed by the Institute for Agglomeration Development of Nizhny Novgorod Region. The parameters of the KRT were approved by the regional headquarters for the implementation of urban planning policy, chaired by Deputy Governor Sergey Morozov; the concept was presented on November 17, 2025.[2]
The master plan covers five sites with a total area of 4.7 hectares (according to other sources, 4.5 hectares[1]) within the boundaries of Volodarsky, Gruzinskaya, Alekseevskaya and Osharskaya streets. The project provides for the demolition of several buildings and structures, including the stadium itself and the sports grounds next to it. According to the officially published draft resolution, the area of the KRT is 4.42 hectares; 18 objects are designated for demolition, most of which are owned by City Hall and under the operational management of the Vodnik sports school: among them are a football field, a hockey rink, a figure skating school, a sports club, a referee booth, and two tennis courts at 30A Alekseevskaya Street, as well as four garages of the "Start" cooperative on Osharskaya Street, owned by the specialized developer "IKHTIS."[6] Under the project, 18 buildings within the territory are slated for demolition, a significant portion of which have been declared unsafe.
The stadium administration building in the southwestern part is to be dismantled, but with an obligation to recreate it at a neighboring location with an exact reproduction of the architectural design of its facades; the building's new function will be a service complex for the adjacent residential areas. The master plan also provides for the removal of the stadium's old stands and the repurposing of its administration building.[3][4] 11,000 square meters will be allocated for sports purposes; the facility is designed to serve about 5,000 schoolchildren and kindergarten pupils.[2]
Parameters of the Stadium Reconstruction
The football field is planned to be reduced to 62×42 meters, with a focus on youth and junior sports; the reconstructed stadium is expected to host training sessions for pupils of the Vodnik sports school.[7] The freed-up area is allocated for a basketball court, a workout zone, three sprint tracks, and three circular running tracks. On the adjacent territory, a three-story multifunctional sports complex is to be built, with a year-round ice arena — potentially the first modern indoor ice rink in the center of Nizhny Novgorod — as well as training halls and a fitness club. The investment portion of the project includes a skyscraper up to 140 meters tall.
As part of the first phase of the KRT, a physical culture and recreation complex is planned on the stadium site, with a multipurpose sports hall measuring 48×30 meters and an indoor hall with a 56×26-meter ice rink, as well as an apartment building up to 14 stories tall; the second phase provides for a residential building of variable height from 9 to 42 stories and the recreated Vodnik administration building.
Among the residential buildings envisioned by the master plan is a two-tower building of variable height, from 9 to 42 stories, which is meant to become the focal point of the boulevard on Zvezdinka Street, as well as a 14-story apartment building with an embanked parking lot in the eastern part of the site.[3][6] About 800 parking spaces are planned, more than a third of which the investor will transfer to the municipality free of charge. The parking spaces are designed to be located beneath the soccer field.[4] Under the terms of the project, construction is planned to begin with the social facilities, which upon completion will pass into municipal ownership and be open to the public;[1] all sports infrastructure built as part of the KRT (comprehensive territorial development) project will likewise be transferred to the municipality after construction is finished.[8][1][5] The cost of the sports infrastructure within the KRT project is estimated at roughly 2 billion rubles.
Previously, it had been expected that the stadium grounds would be put up for auction in the first quarter of 2026, but as of August 2026 the agreement on the comprehensive development of the Vodnik Stadium territory had still not been signed. The maximum implementation period under the KRT decision is 9 years from the date the comprehensive territorial development agreement is signed. The total floor area of new real estate under the KRT project will exceed 114,000 square meters; underground parking garages for 1,015 vehicles are planned beneath the buildings, and the estimated population of the new residential buildings will be about 1,579 people.[6][4][1][5] An architectural competition for the KRT project will be announced only after such an agreement is signed.[5][1][2] Ministry of Urban Development and Agglomeration Development of Nizhny Novgorod Region explained that the KRT procedure for non-residential development proceeds in several consecutive stages: first, the draft KRT decision is approved by the Nizhny Novgorod Region government, after which the owner of the real estate within the territory's boundaries is sent an offer to conclude an agreement; if the owner refuses, the Region is entitled to hold an auction and conclude an agreement with the winner.[1][2]
Procedure for KRT of Non-Residential Development
The procedure for KRT (comprehensive development of territory) of non-residential development involves several sequential stages: approval and publication of the draft decision on the official website of the regional government, and sending a proposal to conclude an agreement to the owner of the real estate; if the owner refuses, the region has the right to decide to hold a tender and conclude an agreement with the winner of the auction. The procedure for deciding on KRT of non-residential development provides for sequential stages: after the draft is approved and published, a proposal to conclude an agreement is sent to the owner of the properties; if the owner refuses, the region has the right to hold a tender, following which the agreement is concluded with the winner.[2][1][5] According to the established procedure, after the draft is approved by the regional government, a proposal for an agreement will be sent to the owner of the real estate within the boundaries of the territory; if the owner refuses, the region has the right to put the site up for tender.
In Culture
In 2005, one of the episodes of Aleksey Balabanov's crime comedy "Zhmurki" was shot at Vodnik: a conversation between the characters about the harms of smoking after a football match at the start of the film.[9] By the time of filming, the stadium had fallen into neglect, and its appearance matched the tone of the film; the scene became one of the most quoted in the picture.[10]
The stadium at 30A Alekseevskaya Street is one of the Nizhny Novgorod locations of "Zhmurki," along with the bathhouses on Kovalikhinskaya Street, the buildings on Bolshaya Pecherskaya, Maxim Gorky Square, Ilyinskaya Street and Proviantskaya Street, and the Nizhne-Volzhskaya Embankment.[9] In the "Kinokarta Rossii" catalog, Vodnik is listed as a location of this film only; no publications record any other filming at the stadium.[11]
According to the explanation of the regional Ministry of Urban Development, the KRT procedure for the stadium site involves several stages: first, the draft decision on KRT of non-residential development is approved by the Nizhny Novgorod Region government, then the authorities offer the owners of real estate within the site's boundaries the opportunity to conclude a KRT agreement; if the owners refuse, the region has the right to put the site up for tender and conclude an agreement with the auction winner; an architectural competition for the project of comprehensive development of the Vodnik stadium territory is provided for only after the KRT agreement is concluded.[5]
The investment part of the master plan provides for the construction of a skyscraper up to 140 meters tall; the master plan permits the erection of a multi-story building up to 140 meters tall within the area of the Comprehensive Development of Territory (CDT) project. The CDT master plan for the Vodnik Stadium area covers five sites with a total area of 4.7 hectares; in addition to sports infrastructure, the project includes investment facilities, notably a skyscraper up to 140 meters tall within the boundaries of Volodarskogo, Osharskaya, Gruzinskaya, and Alekseevskaya streets.[5][1] The CDT area is bounded by Volodarskogo, Osharskaya, Gruzinskaya, and Alekseevskaya streets.[5][2][1]
In film
- 2025 — Comeback": scenes of a series about Nizhny Novgorod in 2004 were filmed at the stadium.
Chronicle of events
Details of each event are in the article about it; here are the dates and gist.
- — A master plan for the redevelopment of the Vodnik stadium territory in Nizhny Novgorod has been published.[4]
Sources
- NIA "Nizhny Novgorod" — Authorities Explain When the Agreement on the Vodnik Stadium in Nizhny Novgorod Will Be Signed. Nizhny Novgorod News (archive)
- Vremya N — The Agreement on the Comprehensive Development of the Vodnik Stadium Territory Has Not Yet Been Signed (archive)
- Govorit Nizhny — On November 5, 2025, the Ministry of Urban Development of Nizhny Novgorod Region published the draft plan for the comprehensive development of the site; for the implementation of the entire proje
- NN.RU — Under the project, 18 buildings within the territory are slated for demolition, a significant portion of which have been declared unsafe.
- GIPERNN — Mingrad Comments on the Prospects of the CDT at the Site of the Closed Vodnik Stadium (archive)
- GIPERNN — According to the officially published draft resolution, the area of the CDT is 4.42 hectares. Eighteen structures have been designated for demolition, most of which are in a
- Nizhegorodskaya Pravda — The reconstructed stadium is expected to host classes for pupils of the Vodnik sports school. (archive)
- Kommersant (Volga Region) — All sports infrastructure built as part of the CDT will be transferred to the municipality once construction is complete. (archive)
- Nizhegorodskaya Pravda — The Nizhny Novgorod Locations of "Zhmurki" and What Became of Them (archive)
- Rossiyskaya Gazeta — A Guide to the Filming Locations of the Movie in Nizhny Novgorod (archive)
- spec.kino-teatr.ru — Film Map of Russia — Location Card "Vodnik Stadium" — the Film "Zhmurki" (archive)
