
What links to “Tunnel Boring Machine «Alyona»”
3 articles of the encyclopedia cite this article. Next to each — the phrase the link sits in.
- Excavation of the First 200 Metres of the Metro Tunnel to Svobody Square (2026)The right tunnel is being driven by a second machine, Alyona, which began boring from Gorky Street in late July; it bypasses the historic 1833 block from the other …
- Presentation of Design Sketches for Sennaya and Ploshchad Svobody Metro Stations… "Evdokia" had advanced the first 200 metres from Gorky Street toward Freedom Square; in late July 2026, a Tunnel Boring Machine «Alyona»" — was launched along the same route. Completion of both stations is scheduled for December 2027. According …
- Tunnel Boring Machine "Evdokia"Running in parallel with "Yevdokiya," the right tunnel is being bored by the second shield — "Alyona", launched in late July 2026 from the same starting shaft on Gorky Street. The name "Alyona" was given in …
