The Gorky Railway (Горьковская железная дорога), known in Russian as the Gorkovskaya magistral, is one of the oldest and largest trunk railways in Russia, stretching from the Moscow region eastward through the Volga Region and beyond the Ural Mountains. Its headquarters city is Nizhny Novgorod, a city of more than a million people on the Volga, roughly 400 km (250 miles) east of Moscow, which was renamed Gorky in Soviet times and was a closed city — one that foreigners could not enter — until 1991. The railway takes its current name from that Soviet-era name of the city. The Gorky Railway traces its origins to the Moscow–Nizhny Novgorod Railway (Московско-Нижегородская железная дорога), built in 1862, making it one of Russia's earliest main lines. [1][2] In its present form it is a branch of Russian Railways (Российские железные дороги, RZD), the national rail operator, which was constituted as an open joint-stock company in 2003. [2]
The Gorky Railway and the world
The Gorky Railway appears on Russian Railways' official roster of the country's named regional railways, a list that includes the Trans-Baikal, Far Eastern, West Siberian and other historically constituted lines. [1] Each of these railways operates as a territorial branch of Russian Railways, which since 2003 has been the single successor company to the Soviet-era Ministry of Railways. [2] The Gorky Railway's significance for international rail traffic stems partly from the fact that one of the neutral sections of the Trans-Siberian Railway — the rail corridor linking European Russia with the Pacific coast — passes through its zone of responsibility. [3] The line between Nizhny Novgorod and Moscow is one of the most intensively used passenger corridors in the Russian Federation, and the railway serves as the main rail gateway for freight and passengers travelling between Moscow and the Ural–Volga industrial belt. [3]
During the Second World War, the Gorky Railway performed critical logistical functions. A 2020 scholarly study published in the Vestnik of Kostroma State University examined the system of labour protection and occupational health management on the Gorky Railway during the war years and the subsequent transition to peacetime conditions, drawing on materials from the Central Archive of Nizhny Novgorod Region. The study noted that the topic had received limited attention in existing historiography, and introduced into scholarly circulation new information about the wartime organisation of working conditions and healthcare reform on the railway. [4]
The Gorky Railway and Nizhny Novgorod
The story of the Gorky Railway begins in the city then known by its full historical name, Nizhny Novgorod, the commercial capital of the Volga region and the site of the famous Nizhny Novgorod Fair — Russia's largest annual trade fair, which drew merchants from across the empire and beyond. The first proposals for a railway from the capital to Nizhny Novgorod date to the 1830s. N. P. Shcheglov published a proposal in the press for a line between St Petersburg and Nizhny Novgorod, an idea supported by other public figures including M. S. Volkov, whose article defending railway construction in Russia was intended for publication by Alexander Pushkin in the journal Sovremennik in 1836. [3]
The question was finally resolved in 1857, when a concession for construction was granted to the Main Society of Russian Railways (Главное общество Российских железных дорог), which the executive authority then transferred to the Main Central Administration, headed by the French engineer K. Kollignon. Practical construction was carried out under Russian engineers, among them graduates of the Institute of the Corps of Railway Engineers, including A. I. Delvig. Surveyors used data gathered during preparations for a planned Moscow–Nizhny Novgorod highway in 1845 to lay out the route. [3]
Construction on the Moscow–Vladimir section began in May 1858; work on the Vladimir–Nizhny Novgorod stretch commenced in spring 1859. The workforce combined hired labourers and peasants brought in under compulsory arrangements from the surrounding guberniyas (pre-revolutionary administrative provinces). The line was the first in Russia to use rails produced at the state-owned Kamsko-Votkinsk plant. Major engineering works included the Gorodishchevskoye, Kovrovsky and Galichsky bridges. Twenty-seven stations were built, along with locomotive depots, passenger stations (вокзалы), a sleeper-treatment plant, and railway workshops — the most technically equipped of which were at Kovrov. Housing for workers and staff was provided, and the line's institutions included libraries and hospitals. Training for railway personnel was carried out at technical schools in Kovrov and in Nizhny Novgorod. [3]
Through passenger and freight services opened across the full length of the line on 1 August 1862, though work to reinforce embankments, strengthen engineering structures and develop stations continued for another two to three years. The first head of the railway, appointed in 1863, was I. F. König, who served until 1868. The initial route passed through the territories of Moscow, Vladimir and Nizhny Novgorod Governorate, connecting the centre of Russia with the Volga region and the country's eastern districts. Its total length in 1862 was 410 versts (approximately 437 km or 272 miles); the roadbed was prepared for two tracks from the outset, though the line operated as a single track until 1875. Second tracks were laid on the Moscow–Vladimir section (237 versts) in 1878, and extended to Nizhny Novgorod in 1892. By 1888 the railway's rolling stock included 3,623 freight wagons and 268 passenger carriages. [3]
The Moscow–Nizhny Novgorod Railway played a central role in supplying Moscow with agricultural produce and in moving goods to and from the Nizhny Novgorod Fair, the commercial event that defined the city's identity throughout the nineteenth century. Until 1894, the line belonged to the Main Society of Railways. Between 1893 and 1895 it was merged with the Moscow–Kursk Railway and the Murom Railway (Муромская железная дорога), with unified management in Moscow. The net yield of the combined enterprise was approximately 4.7 percent of the principal capital, which stood at 273 million rubles in 1900. [3]
In May 1918, the railway was transferred to the authority of the NKPS — the People's Commissariat of Railways (Народный комиссариат путей сообщения СССР), the Soviet-era transport ministry. In 1932, Nizhny Novgorod was renamed Gorky, after the writer Maxim Gorky who had been born there, and in 1936 a decree of the People's Commissariat of Railways separated the Gorky Railway from the Moscow–Kursk Railway as an independent entity. At the same time, the Kazan Railway was separated from the Moscow–Kazan Railway. In 1961, the Gorky and Kazan railways were merged into a single enlarged Gorky Railway in its present form. [3]
The wartime record of the Gorky Railway has been the subject of academic study. The 2020 article in the Vestnik of Kostroma State University, based on archival materials from the Central Archive of Nizhny Novgorod Region and normative documents of the period, documented how the railway's Department of Labour Protection and Safety Management organised working conditions, health education, and administrative reform under the extreme pressures of wartime. The study described the railway's response to the challenge of maintaining safe operations while the Soviet economy was mobilised for war, and examined subsequent healthcare reforms in the rail sector as the country transitioned back to peacetime. [4]
In 2003, when the Russian state reorganised its rail system, the Gorky Railway became a branch (филиал) of the new open joint-stock company Russian Railways (ОАО «Российские железные дороги»). [2] The railway's headquarters remained in Nizhny Novgorod, confirming the city's role as the administrative centre of this major trunk line. [3][5]
The railway's connections to the wider network
In its current form, the Gorky Railway extends 5,734 km from Petushki station in Vladimir Oblast — the railway's western boundary — to Druzhinino station in Sverdlovsk Oblast, at the edge of the Ural Mountains. [3] It borders four other Russian railways: the Moscow Railway at Petushki and Cherusti stations, the Sverdlovsk Railway at Cheptsa and Druzhinino, the Northern Railway at Novki, Susolovka and Svecha, and the Kuibyshev Railway at Krasny Uzel and Tsil'na. [3]
The railway serves 15 constituent subjects of the Volga Federal District and neighbouring regions, among them six republics — Mordovia, Chuvashia, Udmurtia, Tatarstan, Mari El and Bashkortostan — and eight oblasts: Moscow, Vladimir, Nizhny Novgorod, Kirov, Sverdlovsk, Vologda, Ryazan and Ulyanovsk, as well as Perm Krai. [3] The railway's zone encompasses 205 administrative-territorial districts with a combined population of more than 14 million people. [3] The route passes through the highest concentration of Russian cities with populations over one million, making the Gorky Railway one of the country's busiest passenger railways. [3]
A key section of the Trans-Siberian Railway — the neutral segment connecting the European and Asian parts of the Russian rail network — runs through the Gorky Railway's operational zone, giving the line major transit significance for east–west freight flows across Russia and beyond. [3] At the same time, the railway's territory is itself a substantial source of outbound freight, including petroleum and petroleum products, chemical and fertiliser industry output, metallurgical and machine-building products, timber and processed forest products, and construction materials. [3]
The technical scale of the railway is considerable. The total developed track length is 12,066.4 km, with main-line track measuring 7,987 km. [3] The operational length is 5,295.6 km, and the electrified operational length is 2,896 km. [3] Electric traction accounts for approximately 90 percent of all haulage on the railway. [3] The main lines consist of two parallel east–west corridors: Moscow–Nizhny Novgorod–Kirov and Moscow–Kazan–Yekaterinburg, connected by cross-links. [3] The main-line track is laid primarily with heavy R-65 rail, which covers 7,809.4 km or 98.1 percent of the main track. [3] The network includes 389 stations, four of them large marshalling yards (сортировочные станции) — sorting facilities where freight wagons are assembled into new train consists — all equipped with mechanised humps. [3] The largest stations, well known across the 1,520 mm (broad gauge) rail network, include Gorky-Sortirovochny, Gorky-Moskovsky (the main freight and sorting yard serving Nizhny Novgorod), Kirov, Kazan, Agryz, Izhevsk, Kostarikha, Vladimir, Lyangasovo and Yudino. [3] More than 250 stations handle freight operations. [3] The railway annually carries more than 90 million passengers and dispatches more than 44 billion tonne-kilometres of freight. [3]
Express suburban and inter-regional services — marketed under the brand name Ekspress — link Nizhny Novgorod with all neighbouring major cities, including Kirov, Kazan, Murom and Vladimir. [3] From 2002, accelerated passenger trains capable of 140 km/h operated on the Moscow–Nizhny Novgorod corridor, and from January 2007 a major reconstruction programme was launched to upgrade that corridor for speeds of 160 km/h. [3] Investment in 2007 alone amounted to approximately 4 billion rubles, with total programme spending under Russian Railways' high-speed development programme projected at more than 9.5 billion rubles, supplemented by capital repair budget funds. [3] The upgrade involved reconstruction of the permanent way, renewal of overhead contact lines at stations, modernisation of automatic block-signalling systems, elimination of track curves and lengthening of station loops, and the acquisition of new rolling stock. [3] By the end of 2007, eight stations — Kosterovo, Yuryevets, Boldino, Koloksha, Mstera, Saryevo, Terekhovitsy and Vtoroye — had been handed over after reconstruction. [3] A total of 28 stations were scheduled for reconstruction on the Nizhny Novgorod–Petushki section, with work on the Petushki–Vyazniki segment as the main focus for 2007 and work on Vyazniki–Gorky Moskovsky planned for 2008. [3] Plans drawn up at the time envisaged that high-speed Velaro RUS electric multiple-unit trains built by Siemens would subsequently operate on the Nizhny Novgorod–Moscow route, with a covered depot facility for eight such trainsets to be based on the Gorky Railway, four allocated to the Moscow–Nizhny Novgorod service and four to the Moscow–St Petersburg service. [3]
Between 2005 and 2007, the railway completed construction or major reconstruction of passenger stations across its network. New or fully reconstructed stations opened in 2005 at Izhevsk, Kazan, Kukmor, Shumerlya, Kotel'nich, Kovrov, Yoshkar-Ola and Uren. In 2006, new stations opened at Alatyr, Semyonov, the suburban terminus at Gorky-Moskovsky, and in Nizhny Novgorod itself. The station at Vurnary reopened after full reconstruction during the same period. [3] The main passenger terminal in Nizhny Novgorod — the Moscow Railway Station (Московский вокзал) — serves as the principal gateway for long-distance and high-speed services on the westward corridor. [3]
Memory and legacy
The Gorky Railway's official archive (Архив дороги) is maintained by the railway administration and serves as a repository for the institutional history of the line from its nineteenth-century origins to the present. [3][5] The Central Archive of Nizhny Novgorod Region holds documents relating to the railway's wartime operations, including the records of the Department of Labour Protection and Safety Management that formed the basis of the 2020 Kostroma State University study. [4]
In December 2021 the railway opened a multimedia project called Istorichesky Bagaz (Исторический багаж, "Historical Luggage") at Izhevsk station, presenting the history of the Gorky Railway to travellers. [5] The railway maintains active social-media and digital-media channels, including a photographic archive (Фотобанк дороги) accessible through its official website. [3][5]
The railway's five operational divisions — the Murom, Gorky, Kirov, Kazan and Izhevsk divisions — each carry their own institutional histories rooted in the lines absorbed into the network over its 160-year existence. [3] The anniversary of the founding of the Moscow–Nizhny Novgorod Railway in 1862 is counted as the foundation date of the entire Gorky Railway, making 2022 the line's 160th year. [2] The railway's administrative home, the city of Nizhny Novgorod, remained the operational headquarters throughout the Soviet period under the name Gorky, and continues in that role today as the railway's штатный город — the city to which the railway is officially assigned. [3]
Links
- Official website (gzd.rzd.ru)
- Wikidata (Q1351775 — entry in the free knowledge base)
Sources
- Russian Railways (RZD) — "History of Russian Rail Lines," eng.rzd.ru, accessed September 2019 (archive)
- Vremya N (newspaper) — "Gorky Railway turns 160 years old — In 2003 the open joint-stock company Russian Railways was formed, of which Gorky Railway became a branch," 2003 (in Russian) (archive)
- Gorky Railway official website (gzd.rzd.ru) — "Горьковская ЖД" [Gorky Railway], gzd.rzd.ru, December 2021 (in Russian) (archive)
- Vestnik of Kostroma State University — "Labour Protection on Gorky Railway during the World War II and in the Postwar Period," 2020
- Gorky Railway official website (gzd.rzd.ru) — "Горьковская ЖД" [Gorky Railway], gzd.rzd.ru, December 2021 (in Russian) (archive)
